Mechanical installation
We set, align and assemble machines and conveyors and install the cable containment – ready for the electrical and automation crews.
The first crew on site: machines and conveyors in place, containment ready before the cables arrive.
Request: Mechanical installationAcross the line lifecycle
| 1 | Mechanical preparation |
| 2 | Cable containment |
How we deliver
- Crew
- foreman, fitters, helpers
- Foreman language
- German, English
- Billing
- approved hours
Machine and equipment installation
Machines, conveyors and structures positioned, aligned and connected.
- Assembly of machines and line components
- Conveyor systems and handling equipment
- Positioning, alignment and mechanical connection
- Disassembly and reassembly for modernisation
Detailed scope of work (8)
- Installation of production equipment and systems
- Assembly of machinery and production components
- Installation of conveyor systems and handling equipment
- Positioning and mechanical installation of machinery and equipment
- Installation of supporting structures and structural components
- Mechanical connection and alignment of system components
- Preparation of systems for electrical installation and automation
- Disassembly and reassembly of systems during modification and modernisation projects
Cable containment
Containment that keeps cabling tidy, makes maintenance easy and leaves room for future expansion.
- Cable trays and ladders, ducts and trunking
- Brackets, supports and fixing systems
- Containment for power and data cables
- Modifying and extending existing containment
Detailed scope of work (8)
- Installation of cable trays and cable ladders
- Installation of cable ducts and trunking systems
- Installation of supporting structures
- Installation of brackets, supports and fixing systems
- Installation of cable runs between system components
- Containment for power and data cabling
- Modification and extension of existing cable support systems
- Mechanical modifications and extensions of existing installations
From our sites
All photosStandard on every job
Every service, every site.
- LabellingCables, cores and signals labelled to the documentation
- DocumentationWe work to your technical documentation
- ChecksConnections checked before testing
- CommissioningPreparation and support for your commissioning team
Where we come in
When you call us:
- 1
Mechanical preparation
- 2
Cable containment
- 3
Electrical installation
- 4
Automation and safety
- 5
Checks and commissioning
- 6
Maintenance and modernisation
- Mechanical installation – Stage 1–2
- Electrical installation – Stage 2–3
- Automation and PLC – Stage 4–5
- Maintenance and modernisation – Stage 6
New line
Setting machines and conveyors and installing containment ahead of the electrical crew.
Retrofit
Dismantling, relocation and reassembly; extending containment.
Shutdown
Component replacement and containment changes within the shutdown window.
Where we have worked
- 2025Volvo Cars, Valaliky
- 2024–2025Mercedes-AMG, Affalterbach
- 2023–2025Mercedes-Benz, Rastatt
- 2025Mercedes-Benz, Stuttgart
- 2021–2025Mercedes-Benz, Sindelfingen
- 2021–2025BMW, München
- 2021–2025AUDI, Ingolstadt
- 2022–2025VW, Bratislava
Frequently asked questions
Do you supply materials?
Cables, trays and fixings are usually supplied by the client; we can procure them by agreement.
Planning an installation or retrofit?
Tell us what, where and when, and we will send you a quote.