Fitter on a scissor lift bolting a cable-ladder bracket

Mechanical installation

We set, align and assemble machines and conveyors and install the cable containment – ready for the electrical and automation crews.

The first crew on site: machines and conveyors in place, containment ready before the cables arrive.

Request: Mechanical installation

Scope

Across the line lifecycle

1Mechanical preparation
2Cable containment

How we deliver

Crew
foreman, fitters, helpers
Foreman language
German, English
Billing
approved hours

Machine and equipment installation

Machines, conveyors and structures positioned, aligned and connected.

  • Assembly of machines and line components
  • Conveyor systems and handling equipment
  • Positioning, alignment and mechanical connection
  • Disassembly and reassembly for modernisation
Detailed scope of work (8)
  • Installation of production equipment and systems
  • Assembly of machinery and production components
  • Installation of conveyor systems and handling equipment
  • Positioning and mechanical installation of machinery and equipment
  • Installation of supporting structures and structural components
  • Mechanical connection and alignment of system components
  • Preparation of systems for electrical installation and automation
  • Disassembly and reassembly of systems during modification and modernisation projects

Cable containment

Containment that keeps cabling tidy, makes maintenance easy and leaves room for future expansion.

  • Cable trays and ladders, ducts and trunking
  • Brackets, supports and fixing systems
  • Containment for power and data cables
  • Modifying and extending existing containment
Detailed scope of work (8)
  • Installation of cable trays and cable ladders
  • Installation of cable ducts and trunking systems
  • Installation of supporting structures
  • Installation of brackets, supports and fixing systems
  • Installation of cable runs between system components
  • Containment for power and data cabling
  • Modification and extension of existing cable support systems
  • Mechanical modifications and extensions of existing installations

From our sites

All photos
  • Rooftop cable tray
  • Preparing and pulling cables
  • Rooftop cable tray
  • Cables laid in tray
  • Cable routing along the line
  • Floor trunking beside the line
  • Floor trunking beside the line
  • Floor trunking beside the line
  • Floor trunking beside the line

Standard on every job

Every service, every site.

  • LabellingCables, cores and signals labelled to the documentation
  • DocumentationWe work to your technical documentation
  • ChecksConnections checked before testing
  • CommissioningPreparation and support for your commissioning team

Where we come in

When you call us:

  1. 1

    Mechanical preparation

  2. 2

    Cable containment

    Electrical installation

  3. 3

    Electrical installation

    Electrical installation

  4. 4

    Automation and safety

    Automation and PLC

  5. 5

    Checks and commissioning

    Automation and PLC

  6. 6

    Maintenance and modernisation

    Maintenance and modernisation

  • New line

    Setting machines and conveyors and installing containment ahead of the electrical crew.

  • Retrofit

    Dismantling, relocation and reassembly; extending containment.

  • Shutdown

    Component replacement and containment changes within the shutdown window.

Where we have worked

  • 2025Volvo Cars, Valaliky
  • 2024–2025Mercedes-AMG, Affalterbach
  • 2023–2025Mercedes-Benz, Rastatt
  • 2025Mercedes-Benz, Stuttgart
  • 2021–2025Mercedes-Benz, Sindelfingen
  • 2021–2025BMW, München
  • 2021–2025AUDI, Ingolstadt
  • 2022–2025VW, Bratislava
All references

Frequently asked questions

Do you supply materials?

Cables, trays and fixings are usually supplied by the client; we can procure them by agreement.

Planning an installation or retrofit?

Tell us what, where and when, and we will send you a quote.

Request a quote

+421 908 974 188Get a quote